1987 version
ISO 9000:1987 had the same structure as the UK Standard BS 5750, with three ‘models’ for quality management systems, the selection of which was based on the scope of activities of the organization:
ISO 9001:1987 Model for quality assurance in design, development, production, installation, and servicing was for companies and organizations whose activities included the creation of new products.
ISO 9002:1987 Model for quality assurance in production, installation, and servicing had basically the same material as ISO 9001 but without covering the creation of new products.
ISO 9003:1987 Model for quality assurance in final inspection and test covered only the final inspection of finished product, with no concern for how the product was produced.
ISO 9000:1987
1994 version
was also influenced by existing U.S. and other Defense Standards (”MIL SPECS”), and so was well-suited to manufacturing. The emphasis tended to be placed on conformance with procedures rather than the overall process of management—which was likely the actual intent.ISO 9000:19942000 version
emphasized quality assurance via preventive actions, instead of just checking final product, and continued to require evidence of compliance with documented procedures. As with the first edition, the down-side was that companies tended to implement its requirements by creating shelf-loads of procedure manuals, and becoming burdened with an ISO bureaucracy. In some companies, adapting and improving processes could actually be impeded by the quality system.ISO 9001:2000
The ISO 9000 standard is continually being revised by standing technical committees and advisory groups, who receive feedback from those professionals who are implementing the standard.2008 version
ISO 9001:2008 only introduces clarifications to the existing requirements of ISO 9001:2000 and some changes intended to improve consistency with ISO 14001:2004. There are no new requirements. Explanation of changes in ISO 9001:2008. A Practical Guide to ISO 9001:2008 Implementation A quality management system being upgraded just needs to be checked to see if it is following the clarifications introduced in the amended version.
combines the three standards 9001, 9002, and 9003 into one, called 9001. Design and development procedures are required only if a company does in fact engage in the creation of new products. The 2000 version sought to make a radical change in thinking by actually placing the concept of process management front and center (”Process management” was the monitoring and optimizing of a company’s tasks and activities, instead of just inspecting the final product). The 2000 version also demands involvement by upper executives, in order to integrate quality into the business system and avoid delegation of quality functions to junior administrators. Another goal is to improve effectiveness via process performance metrics — numerical measurement of the effectiveness of tasks and activities. Expectations of continual process improvement and tracking customer satisfaction were made explicit.
No comments:
Post a Comment